TEKSUN PROCESS

End-to-End Product Development & Project Fulfillment

Teksun's New Product Introduction Process

Here is Teksun’s established New Product Introduction Life Cycle, meticulously designed to encompass every crucial stage from conceptualization to commercialization. At every step of this journey, Teksun stands ready to provide unwavering support and guidance.
Phase 1
PLAN & DEFINE PROGRAM
Phase 2
PRODUCT DESIGN & DEVELOPMENT
Phase 3
PROCESS DESIGN & DEVELOPMENT
Phase 4
PRODUCT & PROCESS VALIDATION
Phase 5
FEEDBACK, ASSESSMENT & CORRECTIVE ACTION
Key Activities :

  • Customer SOR/ RFQ
  • Review of customer inputs/ drawings and samples.
  • Team feasibility commitment review complete and go ahead received from CFT.
  • Risk analysis review complete and go ahead received from CFT.
  • CFT declaration
  • Design goals reviewed.
  • Reliability & quality goals reviewed
  • Preliminary bill of material for costing
  • Preliminary process flow diagram for costing
  • Concept 2D/3D part drawing for costing.
  • Equipment Planning
  • Equipment specification cost planning Product Design Development

Key Activities :

  • Customer Go ahead for development
  • APQP Timing Plan preparation and review
  • Review of input and output parameters
  • 2D/3D drawings review
  • Part List preparation post defining selection criteria & Components Arrangement
  • Proto sample preparation & Testing
  • Design verification Testing
  • DFMEA Preparation
  • Proto control Plan preparation
  • Updation of Design Poka-Yoke
  • Bench marking report review if benchmark sample available
  • Submission of proto samples to customer
  • Customer Loodback

Key Activities :

  • Equipment, Tester & Fixture concept & detail design development & manufacturing.
  • Check & implement applicable MP info sheet.
  • Completion of sample inspection report for tooled-up part
  • PFMEA PFC,C PMSA & Process capability review
  • Pre-production trial run
  • Tool Validation Report
  • Identification and review of critical processes
  • Review and finalization of packaging standard

Key Activities :

  • Durability Test Review
  • Production Trial run review
  • Process capability review
  • PPAP Document review
  • Packaging evaluation review
  • Control Plan Review
  • PFMEA Review
  • DFMEA Review
  • Arrangement of Components for Pilot lot production.
  • Equipment trail at manufacturer site
  • Equipment Installation

Key Activities :

  • Pilot lot submission with PPAP documents
  • Customer Feedback review
  • Review of Design document if required
  • Undation of Lesson Learnt history
  • Undation of design Records
  • Undation of product development history
  • Quality Planning Sign-off
  • Start of production
  • Equipment initial phase production flow

Phase 1
PLAN & DEFINE PROGRAM
Key Activities :

  • Customer SOR/ RFQ
  • Review of customer inputs/ drawings and samples.
  • Team feasibility commitment review complete and go ahead received from CFT.
  • Risk analysis review complete and go ahead received from CFT.
  • CFT declaration
  • Design goals reviewed.
  • Reliability & quality goals reviewed
  • Preliminary bill of material for costing
  • Preliminary process flow diagram for costing
  • Concept 2D/3D part drawing for costing.
  • Equipment Planning
  • Equipment specification cost planning Product Design Development

Phase 2
PRODUCT DESIGN & DEVELOPMENT
Key Activities :

  • Customer Go ahead for development
  • APQP Timing Plan preparation and review
  • Review of input and output parameters
  • 2D/3D drawings review
  • Part List preparation post defining selection criteria & Components Arrangement
  • Proto sample preparation & Testing
  • Design verification Testing
  • DFMEA Preparation
  • Proto control Plan preparation
  • Updation of Design Poka-Yoke
  • Bench marking report review if benchmark sample available
  • Submission of proto samples to customer
  • Customer Loodback

Phase 3
PROCESS DESIGN & DEVELOPMENT
Key Activities :

  • Equipment, Tester & Fixture concept & detail design development & manufacturing.
  • Check & implement applicable MP info sheet.
  • Completion of sample inspection report for tooled-up part
  • PFMEA PFC,C PMSA & Process capability review
  • Pre-production trial run
  • Tool Validation Report
  • Identification and review of critical processes
  • Review and finalization of packaging standard

Phase 4
PRODUCT & PROCESS VALIDATION
Key Activities :

  • Durability Test Review
  • Production Trial run review
  • Process capability review
  • PPAP Document review
  • Packaging evaluation review
  • Control Plan Review
  • PFMEA Review
  • DFMEA Review
  • Arrangement of Components for Pilot lot production.
  • Equipment trail at manufacturer site
  • Equipment Installation

Phase 5
FEEDBACK, ASSESSMENT & CORRECTIVE ACTION
Key Activities :

  • Pilot lot submission with PPAP documents
  • Customer Feedback review
  • Review of Design document if required
  • Undation of Lesson Learnt history
  • Undation of design Records
  • Undation of product development history
  • Quality Planning Sign-off
  • Start of production
  • Equipment initial phase production flow

RFQ to FDR- Teksun Project Delivery Cycle

Below you will discover the various stages of your Project’s Delivery Cycle, starting from a Request for Quotation (RFQ) which initiates
the Product Requirement Gathering process, and ending with a Final Delivery Report, which releases all final Project Deliverables.
01.
RFQ
Request For Quotation
Submitted by Client

➜

  • Requirement Gathering
    Process Initiated

02.
Architecture
Solutioning
Presented by Teksun

➜

  • Initial Requirements &
    Development Approach

➜

  • Approved by Client

03.
Commercials
Solutioning
Presented by Teksun

➜

  • Ballpark Timeline,
    Efforts, & Costing

➜

  • Approved by Client

04.
Project
Proposal
Presented by Teksun

➜

  • SoW, Team Plan, Milestones,
    Payment Terms

➜

  • Approved by Client

05.
PO
Purchase Order
Issued by Client

➜

  • Project Kickoff Amount
    Released by Client

06.
Project
Kickoff
Phase 1, Design

➜

  • Product Requirement &
    Technical System
    Architecture Documentation

07.
Design
Delivery
Phase 1, Design

➜

  • Mutual Sign-off
    on Phase 1

➜

  • Release of all Phase 1
    Deliverables

08.
Development
Kickoff
Phase 2, Development

➜

  • Agile- Continuous
    Sprint Release Cycle

09.
Product
Delivery
Phase 2, Development

➜

  • Inspection & Testing
    of Phase 2 Product
    by Client

10.
FDR
Final Delivery Report
Presented by Teksun

➜

  • Acknowledging All Requirements Met

➜

  • Project Closure Payment Released by Client

➜

  • Mutual Sign-off on Project Closure

➜

  • Final Release of all Deliverables to Client

TALK TO US TODAY

Please share your product idea or need and Teksun will reply to you immediately

Our Partners
TALK TO US TODAY
Please share your product idea or need and Teksun will reply to you immediately