Teksun's 5 Phase IoT Product Development Life Cycle

Below is Teksun’s proven IoT Product Development Life Cycle, which takes into account each essential step in taking a
product from Vision, to Commercialization. Every step of the way, Teksun is there to support.
Phase 1
DESIGN
Phase 2
DEVELOPMENT
Phase 3
CERTIFICATION
Phase 4
PRODUCTION
READY UNIT
Phase 5
MASS
PRODUCTION
Key Deliverable:

  • Requirement Documentation & Technical Blueprints

Key Results:

  • Product Requirement Specification (PRD)
  • Architecture document
  • Test Cases & Acceptance Criteria
  • Component Selection & Bill of Materials (BOM)

Key Deliverable:

  • Functional Prototype
    (1-20 Units)
  • Proof of Concept Prototype (If Required)
  • EVT Prototype

Key Results:

  • Design Version 1.0:
  • PCB Schematic, Layout & Gerber Files
  • Firmware Binary Source Files
  • Mobile & Web Applications
  • Mechanical Design CAD Files
  • Cloud Architecture

Key Deliverable:

  • DFM prototype
  • Certified Prototype
  • DVT Prototype

Key Results:

  • Design Version 2.0:
    – Long Run Testing
    – Corner Cases
    – New Functionalities Update
  • UL, CE, FCC Certifications
  • Enclosure Mold Manufacturing
  • Injection Molded Enclosure
  • Automated Testing Jig

Key Deliverable:

  • Production-Ready
    Prototype
    / Golden Sample (50-100 Units)
  • PVT Prototype

Key Results:

  • Design Version 3.0:
    – Field Testing
    – Performance Improvement
    – Battery Life Improvement
  • Final Design For Manufacturing (DFM) Changes
  • Final Manufacturable Design Files Injection Molded Enclosure

Key Deliverable:

  • Fully Commercialized Product

Key Results:

  • PCB Assembly & Manufacturing
  • Component Supply Chain Management
  • Packaging & Shipping
  • Ongoing QA/QC Testing

Phase 1
DESIGN
Key Deliverable:

  • Requirement Documentation & Technical Blueprints

Key Results:

  • Product Requirement Specification (PRD)
  • Architecture document
  • Test Cases & Acceptance Criteria
  • Component Selection & Bill of Materials (BOM)

clock (1)

4-8 WEEKS

Phase 2
DEVELOPMENT
Key Deliverable:

  • Functional Prototype
    (1-20 Units)
  • Proof of Concept Prototype (If Required)
  • EVT Prototype

Key Results:

  • Design Version 1.0:
  • PCB Schematic, Layout & Gerber Files
  • Firmware Binary Source Files
  • Mobile & Web Applications
  • Mechanical Design CAD Files
  • Cloud Architecture

clock (1)

12 - 52 WEEKS

Phase 3
CERTIFICATION
Key Deliverable:

  • DFM prototype
  • Certified Prototype
  • DVT Prototype

Key Results:

  • Design Version 2.0:
    – Long Run Testing
    – Corner Cases
    – New Functionalities Update
  • UL, CE, FCC Certifications
  • Enclosure Mold Manufacturing
  • Injection Molded Enclosure
  • Automated Testing Jig

clock (1)

4 - 16 WEEKS

Phase 4
PRODUCTION
READY UNIT
Key Deliverable:

  • Production-Ready
    Prototype
    / Golden Sample (50-100 Units)
  • PVT Prototype

Key Results:

  • Design Version 3.0:
    – Field Testing
    – Performance Improvement
    – Battery Life Improvement
  • Final Design For Manufacturing (DFM) Changes
  • Final Manufacturable Design Files Injection Molded Enclosure

clock (1)

4 - 8 WEEKS

Phase 5
MASS
PRODUCTION
Key Deliverable:

  • Fully Commercialized Product

Key Results:

  • PCB Assembly & Manufacturing
  • Component Supply Chain Management
  • Packaging & Shipping
  • Ongoing QA/QC Testing

clock (1)

ONGOING

On Requirement Basis (Optional):

Signal Integrity Hardware Noise Cancellation Test Framework Rigorous Testing of integrated product
Power Integrity Cross Talk Removal Power Optimization Algorithms Whitebox / Blackbox Testing, etc.

RFQ to FDR- Teksun Project Delivery Cycle

Below you will discover the various stages of your Project’s Delivery Cycle, starting from a Request for Quotation (RFQ) which initiates
the Product Requirement Gathering process, and ending with a Final Delivery Report, which releases all final Project Deliverables.
01.
RFQ
Request For Quotation
Submitted by Client

➜

  • Requirement Gathering
    Process Initiated

02.
Architecture
Solutioning
Presented by Teksun

➜

  • Initial Requirements &
    Development Approach

➜

  • Approved by Client

03.
Commercials
Solutioning
Presented by Teksun

➜

  • Ballpark Timeline,
    Efforts, & Costing

➜

  • Approved by Client

04.
Project
Proposal
Presented by Teksun

➜

  • SoW, Team Plan, Milestones,
    Payment Terms

➜

  • Approved by Client

05.
PO
Purchase Order
Issued by Client

➜

  • Project Kickoff Amount
    Released by Client

06.
Project
Kickoff
Phase 1, Design

➜

  • Product Requirement &
    Technical System
    Architecture Documentation

07.
Design
Delivery
Phase 1, Design

➜

  • Mutual Sign-off
    on Phase 1

➜

  • Release of all Phase 1
    Deliverables

08.
Development
Kickoff
Phase 2, Development

➜

  • Agile- Continuous
    Sprint Release Cycle

09.
Product
Delivery
Phase 2, Development

➜

  • Inspection & Testing
    of Phase 2 Product
    by Client

10.
FDR
Final Delivery Report
Presented by Teksun

➜

  • Acknowledging All Requirements Met

➜

  • Project Closure Payment Released by Client

➜

  • Mutual Sign-off on Project Closure

➜

  • Final Release of all Deliverables to Client

TALK TO US TODAY

Please share your product idea or need and Teksun will reply to you immediately

Our Partners
TALK TO US TODAY
Please share your product idea or need and Teksun will reply to you immediately